Gieck Ranch Drainage Basin Planning Study

Gieck Drainage Basin Planning Study
Volume I - Final_Report.pdf
     Appendix A - Existing Conditions Plan Views.pdf
     Appendix B - Existing Conditions Profiles.pdf
     Appendix C - Proposed Conditions Plan Views.pdf
     Appendix D - Proposed Conditions Profiles .pdf
Volume II
     Figure 1.1-Aerial Map.pdf
     Figure 3.1 - Hydrologic Soils Map - North
     Figure 3.2 - Hydrologic Soils Map - Central
     Figure 3.3 - Hydrologic Soils Map - South
     Figure 4.1 - 205 Land Use Map - North
     Figure 4.2 - 2005 Land Use Map - Central
     Figure 4.3 - 2005 Land Use Map - South
     Figure 5.1-2030 Land Use Map - North.pdf
     Figure 5.2 - 2030 Land Use Map - Central
     Figure 5.3 - 2030 Land Use Map - South
     Figure 6.1-Drainage Basins - North.pdf
     Figure 6.2-Drainage Basins - Central.pdf
     Figure 6.3 - Drainage Basins - South
     Figure 7.1 - HMS Layout - North
     Figure 7.2 - HMS Layout - Central
     Figure 7.3 - HMS Layout - South
     Figure 8.1 - Tributary Map
     Figure 9.1 - Flood Comparison Map - North
     Figure 9.2 - Flood Comparison Map - Central
     Figure 9.3 - Flood Comparison Map - South
     Figure 10.1 - Flood Comparison Map - Central
     Figure 10.2 - Flood Comparison Map - Central
     Figure 10.3 - Flood Comparison Map - South
     Figure 11.1 - Environmental Map - North
     Figure 11.2 - Environmental Map - Central
     Figure 11.3 - Environmental Map - South
     Figure 12.1 - Alternative A - North
     Figure 12.2 - Alternative A - South
     Figure 13.1 - Alternative B - North
     Figure 13.2 - Alternative B - South
Volume 3 - Technical Addenda.pdf

Operations Director
Mike Hrebenar

Engineering Division Manager Paul Danley

 Customer  Service Division  Manager
Mike Garrott 

Current Planning  Manager
   Elaine Kleckner