Skip to main contentCounty Home|ADA|Roads|News Releases|Organizational Chart|Index of Services|Volunteer Boards|About El Paso County|Contact Us
Header Banner
Public Meeting Notices
  • The next Highway Advisory Commission meeting is
    October 19, 2016, 9:00am.

department of public works

Executive Director: Jim Reid
Deputy Director: Scot Cuthbertson
County Engineer: Jennifer Irvine

3275 Akers Drive
Colorado Springs, CO 80922
Telephone: 719-520-6460/Fax: 719-520-6879
Current Topics
  • Snow Removal Policies
  • Road Work - Watch for Delays
  • 2016 Major Transportation Corridors Plan Update Website
  • 2016 Asphalt Paving List
  • Upcoming Elbert Road Closure - El Paso County will begin work on the Elbert Road Bridge as early as September 19th, 2016. This bridge will be closed temporarily for repair and maintenance. All traffic will be detoured to Stapleton Dr. and Judge Orr Rd. for the entire duration of this project. The detour length is about two miles. The project duration is expected to take approximately six to eight weeks for construction weather permitting. Work shall consist of replacing the existing bridge deck with new, paving the roadway, sand blasting the structure, painting and guardrail repair (view the vicinity map).
  • Reopening of Marksheffel Road between Fontaine and Bradley - Late Afternoon Saturday, October 15th – Paving of the closed portion of Marksheffel Road between Fontaine and Bradley Rd is scheduled for Friday and Saturday, October 14th and 15th, with the planned reopening of the road at approximately 5:00 pm on Saturday, October 15th. This portion of the roadway has been closed since September 19th to allow construction of the roadway and major drainage structures between Fontaine and the existing 4-lane section at the County/City line. During the closure, traffic has been detoured to Powers Blvd. The construction in this section includes major drainage structures including two large box culverts across the road, elimination of the sharp curve by realigning a portion of the road, and reconstructing a portion of the new road in its current alignment. The north side of the Fontaine intersection will also be completed in conjunction with this closure. This area will still have ongoing construction which, at times, may require lane shifts. Please drive with caution through this area as construction work will continue. Thank you for your patience as we complete this link of the project.
  • Hodgen Road Bridges Now Open - The two Hodgen Road Bridges that were temporarily closed for repair and maintenance are now open. The project is still ongoing to complete painting and minor repairs, but traffic is now allowed on Hodgen and the detour has been lifted (read the Hodgen Road project press release).
  • Black Forest Road Now Open - The culvert replacement project at Black Forest Road at Kettle Creek is substantially complete and the road is back open to all traffic. Only minor finishing touches remain (read the Black Forest Rd project press release).
  • Closure of the West leg of Space Village Rd and Marksheffel Rd Intersection - The west leg of the Space Village/Marksheffel Road Intersection will be closed for approximately 3 weeks beginning Monday, October 3rd to allow construction of the next phase of the project. North/south traffic will be maintained as well as access to/from the east leg of the intersection. The closure is necessary to construct the western portion of the new roadway and reconfigure the intersection. Traffic will be detoured to SH 94 via US 24. Access to local businesses will be maintained from the west. Thank you for your patience as we construct these improvements.
Forms Planning

Transportation Planning

Stormwater Planning

Construction Projects
Pikes Peak Rural Transportation Authority
  • PPRTA Home Page
Baptist Road Rural Transportation Authority


Highway Advisory Commission

Blue text indicates backup material; otherwise there is none. Click on the blue text to access the backup.

Wednesday, October 19, 2016 9:00am

1. Call Meeting to Order

2. Absences

3. Approve Meeting Minutes Previous Month

4. Commissioner/Citizen Comments (not on agenda)

5. Staff Reports

     A. Administration

      B. Engineering Division

6. Adjournment